I just realized after looking through the forum that I didn't update the build journal. I created a stopping point when I thought my brother and nephew were coming over for the holidays, so I stopped work on the diorama so we could do some racing.
I don't have photos. Rather, I have a couple of videos on YouTube. One is a bit of a drone-like view of the build out.
Since the holidays, I have prepared for landscaping the rock surrounding turn three (between the two bridges) as well as the other tunnel entrance/near turns five and six (above town and across the road from the farm).
I was hoping to be at the bridge installation by now, but I want the diorama below nearly completed before then. That is going to include paint, turf/gravel, trees, etc.
If anything, the bridge and what is above it (turns one and two) will be very quick because of the intricate work needed on the diorama on the lowest levels.
I just realized after looking through the forum that I didn't update the build journal. I created a stopping point when I thought my brother and nephew were coming over for the holidays, so I stopped work on the diorama so we could do some racing.
I don't have photos. Rather, I have a couple of videos on YouTube. One is a bit of a drone-like view of the build out.
youtu.be/wPjVYI2ePbU?feature=shared
The second one is a test race of a couple of cars down the track.
youtu.be/VdzRwm9Y1d0?feature=shared
Since the holidays, I have prepared for landscaping the rock surrounding turn three (between the two bridges) as well as the other tunnel entrance/near turns five and six (above town and across the road from the farm).
I was hoping to be at the bridge installation by now, but I want the diorama below nearly completed before then. That is going to include paint, turf/gravel, trees, etc.
If anything, the bridge and what is above it (turns one and two) will be very quick because of the intricate work needed on the diorama on the lowest levels.